Quote:

I don't think you can spray Tremclad, it wasn't designed for that, unless you mean the rattle can type. If you mean that stuff, yeah, you ought to be able to do two coats in a day.

When I rolled on my paint, I did two coats a day, and waited 4-5 hours between coats. I tried to sand the next day, but it wasn't always dry enough for my taste, so I ended up waiting more like 2-3 days before wet sanding.

Your mileage may vary.



It seems like the paint is prone to runs but you can defnitely spray it..

i gave up on the rolling technique after all the sanding i had to do to get the texture out (i realize now if i had been more patient it could have turned out for the better)

but now I've moved on to spraying with a 90 dollar harbour freight turbine hvlp sprayer


so how long did you wait in between coats?