It looks to me like the old school "China Rock" surface concrete which was the primo surface face back on 150th St hey days.

The Connecting got a new face lift about ten years back but they stopped the concrete just before the starting bridge line. The black top at the hole is warped and hurt, not ideal for what plays today.