Making progress on the new shop. All the electrical work is complete just waiting for BG&E our local power company to hook up the meter. I was concerned that the slab was a little thin for the two post lift so I opted to cut two 4’x 4’ holes and had two 5’x 5’x 14” slabs poured. Also insulated both of the 12’ x 12’ doors. Cabinets and lift will be here first of the year.