Made some progress with most of the wiring under the dash and installing the dash along with all the AC ductwork. And put some fuel in the tank so I wouldn’t accidentally run the in tank fuel pump dry. Hope to have it running in 3 or 4 weeks.
Thanks
Pat

[Linked Image]

[Linked Image]

[Linked Image]

[Linked Image]

[Linked Image]

[Linked Image]

[Linked Image]

[Linked Image]