I received a call from GCAR late yesterday and the gauges are done. I'll have them back next week. The dash assembly should be in the car by the weekend.

The carpet also showed up yesterday. I have it laying out in the basement.

I ordered a new VIN sticker from ECS. I also bought a can of RPM. A few of the bolts I redid with Caswell Platings black oxide kit have some surface rust on them. The bolts were sitting in a tub on the damp concrete. The few bolts that have been installed on the car still look good. The sealer that I bought with the black oxide kit isn't going to be good enough. I'll apply the RPM to the bolts instead of the penetrating sealer.