Lube it, stab it, follow the service manual. From this point forward after the intermediate shaft is installed, it goes together lime a regular 727.

Just be careful when you install the valve body that the OD/LU plug that enters the case does not get cocked and broken.
Make sure to check the OD accumulator spring in the valve body, they like to break from time to time.



Last edited by Transman; 05/21/20 09:20 PM.