Still working through stuff on the A-100, got some parts for the others at Fall Fling.
I have the patches for the front and side pretty much ready, just need to do the rear one.
Also, so I don't forget, I need to do the LF back shock bracket and cut the hole for the shifter.
I hope to do the first round of blasting soon, mainly bolt-on parts and stuff. These I can hand off to MoparGnome and get them into primer and start the bodywork process.
The vans at FF were good inspiration. I'm doing a big job on the 100 and running the 108 as-is.