Today I got the gauges cleaned up and tested. I cleaned up the pins and connections on the back too. Once the needle paint dries they'll be wrapped up till installation time.
I also made an appointment with the machine shop to drop the motor off, 2nd week in Jan.

6944150-Gauges.jpeg (300 downloads)