With the tinwork completed it was removed so the roll cage installation could be completed...
As it is I can cut the tin to fit once the cage is installed and do not have to try to fabricate the large pieces around a cage that was already in place...
I am only installing a 6 point cage at this time as I have no idea if this will ever actually be raced...
Main hoop bar with two bars going to rear tight to the top back edge of the package tray and then 2 bars from the cross bar in the main hoop down the floor mounts at an angle...
An additional bar is being installed behind the dash frame with 2 bars running to the front cage mounts on the floor and then two bars running forward to the firewall with steel plates...