A couple more of the drivers side.
I also ordered all of the new brake components for the 10" x 2 1/2" front drums for the A-100 Van axle. I single sourced everything thru www.partsgeek.com except the bearing cover caps on the hubs.
The other pictures are of the miter at the front frame rails before they were welded and the RF box tube pad to carry the roll cage bar at the RF corner. This tubing was tied in to the side of the frame rail and then installed recessed into the inside of the rocker panels where they were plunge cut. Being 3" wide it gives me a little wiggle room later for the roll cage bar placement.

046.jpg047.jpg002.jpg040.jpg

...FAFO...