When finished the 2 rails pictured above will be in line and have an angle of 3.2 degrees up to attach to the bottom of the frame at the radiator support. I will be installing new floor pans so as to not have to repair the removal of all of the factory spot welds at the front frame and torsion bar cross-member.

3 ds frame at kick.jpg

...FAFO...