Here are a few pics of the modified front spring hangers.
Rather than just two tabs that stuck down I added a piece to set against the bottom of the frame and a second one to wrap down around the front of the bracket.
This keeps them solid left to right and increases the available area to weld them in. up
On to the next task...floorboards...tunnel and firewall... realmad

414.jpg416.jpg417.jpg418.jpg

...FAFO...