The last few items were hurriedly moved out, and the demolition work began on Tuesday.
A few errors occurred here. They were not supposed to demo the drywall on the walls. By the time I saw it, it was too late. They also were not supposed to remove the 16' of workbenches, nor the 6-7' of desktop area. So those will have to be reconstructed somehow. The upside is the exterior walls (not shared with the house) were not insulated. I'm going to pay them to do that while they are in there. Also getting a little electrical work done, and having the exterior entry door replaced.
I now have a new pile of things to go through again...the old cabinets, a few missed contents, and some other odds and ends.
More curious smoke patterns, this time from a sheet of peg board sitting 1.5" off the wall. These were 4x8 sheets laid on their side, so 4' up from the workbench surface. Curious how the smoke pushed it's way through the first 5-10 rows of holes, then swept downward.