Another example.

My T/A had a 417 scheduled production date.

The final assembly date on the numbers matching engine was April 22nd.

The Mylar door sticker showed April.

So, based on those three things, I deduced that it was built later than hoped for (after the SPD) but before May.

So, sometime after April 22 but no later than April 30.