Started at 10 AM. By 1:30 main hoop is bent, trimmed, tweaked and tack welded in place. Final bends to get the legs to meet the frame rails took the longest, I didn't want to overbend. Keeping tube level is the biggest trick, but very necessary. Came out straight as an arrow. Measuring, and remeasuring made the final product worth it. The bending was the easiest part.
Now, on to the door bars...

Hoop 1.jpgHoop 2.jpg