I've been knocking the list down and getting a little closer with still a long list to go.
bottom of floor scraped, cleaned - painted. brakes system and lines installed. hydrolic clutch lines done. exhaust and tips installed. dana rear end with leaf springs and new shocks installed. frame connectors fab-ed and welded in. radiator installed. gas tank in and gas lines done except the return line and motor. fitted and altered seats with fab-ed brackets ready to bolt in. carpet precut. dash cover on and installed with wire harness. all glass installed.
have a mock up with the electric wires - relays - computer - battery to power the starter and crank the motor.