The garage door install is scheduled for Monday and Tuesday... boogie
I spent all last night installing all of the light boxes and the siding blocks for the electrical devices.
Set the laser up and shot all 4 elevations with a control line to measure from.
I was able to start installing the siding tonight on the east elevation.
I'll continue with the back tomorrow and then fall back and finish the eave above. up
It's hard to beat using the windows with the J trim for the siding incorporated around them. Turns out to be a really clean finish...

0825172005.jpg0825172004.jpg0825172005a.jpg0825172005b.jpg

...FAFO...