The rest of the roof metal was installed Saturday...
I know it doesn't look like much but I got all of the wood framing finished for the 36" soffit at the front.
I moved over to the east elevation and installed the home wrap and the window and door.
I picked up all of the siding...soffit and J trims this morning.
I need to p/u 6 4" round light boxes to install for the exterior sconces at the front wall and at all of the doors.
Tonight the transmission comes out of the 69 Dart to fix a broken flex plate and install a slightly bigger convertor. whistling
I won't be back into this until Wednesday. mad

0820171408.jpg

...FAFO...