Wood was installed around the steel beams to prevent concrete from the upper slab pour from reaching the basement.
Several penetrations were made through the metal decking into the dividing wall above for electric and for return of air lines and such.
I still need to do a couple more near the panel for the floor heating to return low voltage thermostat wires.
Concrete pour of the slab is scheduled for Monday 10/17/16.

030.jpg031.jpg033.jpg035.jpg