Thx...
I installed the gutter at the front elevation on Saturday morning. This is a much better system than what I had installed many years ago.
I mocked up 3 "story pole" posts at the correct elevations and attached them to the scaffolding. Two of us lifted it up and sat it on the posts easy peasy.
I was able to get 1" of fall from right to left without it being terribly noticeable. I only mocked up the downspout as I needed to move it out some in case it rains before I get everything connected together.
It wasn't up 10 minutes before the wife came outside and complained about seeing the attachment brackets... runaway
Guess I'll be installing the leaf guard after all... rant

1007171603.jpg1007171603a.jpg1007171603b.jpg1007171603c.jpg

...FAFO...