Finished cleaning the basement slab and got the concrete stain finished. 2 coats applied and I have enough for a final coat.
I'm going to have to wait for warmer weather to finish this up.

I added 6" to the bottom plywood shelf since the longer totes wanted to hang off the shelf.

1113181836.jpg1117181858.jpg1119182041.jpg1119182039.jpg

...FAFO...