Add in another 7 ton of #57 gravel topped off with 6 tons of Limestone dust and it is almost up to elevation. I used some water and a tractor along with the dually full of gravel to roll the shale for compaction. Then added the 57's and stonedust using a vibrating plate. Finally I added the 1 1/2" foil faced rigid insulation for under the slab.