The block work was completed and the beam pockets and bond beams were poured full of grout.
Steel plates were added to carry the point loads of the W8-15 beams yet to come.
The weld marks you see are where a J hook is welded to them and submersed into the grout.
They can be seen laying upside down on the wall in the last picture.