There has been a little more progress...
Sunday was decent enough to take the other set of shelving outside and sand and paint it. Once it dried I got it installed into the recessed blocking.
This corner area is supposed to be for all the home and construction related supplies rather than having everything upstairs in the garage...

With all of the insulation finished I was able to go through and remove all the excess insulation materials and start getting things organized.
I built a second overhead rack for storing long items and a place to store the 24' extension ladder.

The 3" x 3" tubing on the rack was two 21' lengths that were being thrown away at work...I'll turn them into something useful...

1112182046a.jpg1112182044.jpg1112182043.jpg1112182043a.jpg

...FAFO...