It worked out real well just lowering the trusses into the hurricane clips as that made for no layout...Not really a time consuming job but there was a lot of climbing around to frame the temporary shoring for the truss's... runaway
I was able to stock 32 sheets of OSB on the roof...That sure beats sliding them up a ladder... up

022 - Copy.jpg024 - Copy (2).jpg027 - Copy (2).jpg031 - Copy (2).jpg

...FAFO...