Digging a 36" deep trench in the ground for the electric that was about 20' long is a PITA but I didn't have to rent a machine.
I also had to incorporate the storm water management underground plumbing into this area to be continued on later.
The entrance porch framing also began. I need this to double as a pour stop for the concrete slab.

6  8-4-16.jpg8-2-16.jpg8-2-16 (4).jpg2  8-7-16.jpg