Digging a 36" deep trench in the ground for the electric that was about 20' long is a PITA but I didn't have to rent a machine. I also had to incorporate the storm water management underground plumbing into this area to be continued on later. The entrance porch framing also began. I need this to double as a pour stop for the concrete slab.