I started installing the Z furring and the R-13 Thermax foil face insulation in the basement. I ripped down 2x6's into (2) 2" strips and tap con-d them in around the window and door openings so I have a substrate for trim... It's really time consuming when your doing the framing, insulation and electrical all at the same time...But it's also one and done...