I picked up the leaf guards for the gutters and installed them front and back...Got all of the scaffolding removed from the front and started tearing down the temporary scaffold at the back. The front gutter is tied in to the Storm Water Management system...once I get the back scaffold down at the corner I can tie in the rear.

1026171656.jpg1023171519.jpg1023171520.jpg1023171520a.jpg

...FAFO...