The plumbing was finished last week, so we have a working bathroom. That was big! We put in three long days of work. I finished wiring the place inside and out, and even managed to get most of the lighting installed and all of the smoke detectors. I also hung a 50” plasma TV and installed and wired a surround sound system. My wife painted nonstop and got a lot of the painting done.