And here's another angle. on Monday while on my breaktime at work, I'm going to install the power steering lines, headers, and carb. And the day after I'll get the valves adjusted, oil pump primed, and distributor properly set into position. Little details here and there to button up. I've got to get it in position so I can mark where to make the hole for the shifter (keisler 5 speed conversion kit)

6045123-DSCN1377.jpg (563 downloads)

-Jarrod Pilone
'70 Plymouth RR Convertible with amazing custom paint(Tribute/Recreation/Whateveryouwannacallit)
My Project Thread