Short block is assembled, At this point in time we are flowing the heads through the intake and throttle body, and with the headers. When that is done everything is ready to finish the long block. The next step is to run it on the test stand. Have a few small things to finish on the run stand. I will post the results and a video of start up and it running.
Thanks for all of the input and interest.
Mike

Last edited by 69 lawndart; 11/09/15 07:44 PM.