Once I got it floating there i just moved the car to it, attached some ratchet straps to the frame rails and the other end to the front of the steel jig and pulled it the final 1/2" into place. The chain fall made for the perfect up and down fine tune adjustment until the whole thing was in the exact spot that the old parts came from and then it was just a matter of plug welding. Not including the fab of the jig, the whole process took about 5 or 6 days.