2 - 3 day window for the assembly of a car at Lynch Road from Body-In-White (BIW) to the end of the assembly line depending at what time of the day it was started in BIW. The Winged Warriors Lynch Road assembly story states "Two Days" from BIW to rolling off end of the line to head to the delivery truck or train car.

From the WW LR story:

The Lynch Road Plant consists of six major areas of assembly, each of which functions as a nearly-independent mini-factory.
•Metal Shop = Body-in-White (BIW): assembly of complete bare body.
• Paint Shop: metal preparation, painting.
•Chassis Department: Engine "dress," mating of engine-transmission-rear end assemblies.
•Trim Line: Installation of body mechanical and electrical parts and sub-assemblies.
•Final Line: Glass, interior, final details.
•Car conditioning: Repair of completed vehicles, misc. tasks.

It will take two day's construction from Metal Shop to loading a running car on a transport truck! The very long assembly lines move slowly and steadily.


MikeR