I was able to bolt the box in without any problems. The coupler alignment came out fine. The offset towards the inner fender shouldn't case any problems. The sector shaft is in almost in the exact space as the original. I am still waiting on fittings. The box uses 16x1.5 inverted flare fittings. I should have that figured out tomorrow.
The only problem so far is reusing my sector support bearing. The nut one the new box is 22x1.5; so the original one won't work. I'll come up with something .





Last edited by tahoechallenge; 01/06/15 09:29 PM.