next up is rebuilding the soon to be delivered upper control arms, new ball joints, new upper control arm bushings, then install them on the car, torque the lower control arm pivot nuts..crank up the tbars....on to the brake and fuel lines, master cyl,splitter,install the interior,carpet, seats....