thanks pete still trying to finish the custom wiring and interior. plus fuel system routing. 1/2 inch aluminum line and walbro 262 pump in a ricks tank for fuel injection. ordered a helcat airbox will be a tight fit in cuda bay. might have to reconfigure alot. using the square hole in rad support for the extra air inlet. have over 85k in project now. motor and trans plus holley wiring and computor was 32k already dyno tuned. learning real fast how to convert new to old. cool thing is factory gas peddle will work with a throttle cable to the black box 2003 ram plugs right into cuda dash firewall. to make lokar cable kickdown work. lots of engineering. using a 2001 pt cruiser fuse panel with relay for the necessary electric fans,supercharger electric pump, fuel pump , and more. big project. should run smooth big power and decent mileage.