Week of April 6th through 11th: Since this was Easter week, I didn't have much time to work on the cab. I spent the last two week's evenings and Saturday, the 11th, writing 3 music soundtracks for Easter service. Still, since work was not too busy, I managed to fabricate the right side of the floor pan.