Once I got it down to a smooth surface across the pads I bolted up the Jesel shaft just to double check. I'm using the existing end holes here as a temp hold down. The existing holes are 3/8 thread and the Jesel hardware is all 7/16 so all of the holes need to be redrilled and tapped.

3213227-testfit.jpg (368 downloads)
Last edited by AndyF; 01/13/07 08:30 PM.