Panels and gaps are getting dialed in starting with rebuilding the left door hinges first. Then a relief cut was made along the bottom of the quarter to pull the quarter in at the bottom. Once the door and lower quarter were set, the forward edge of the quarter was adjusted to create an even gap between the door and quarter.