I never started yet. I had intended to use the epoxy for adhesion and rust prevention in the area requiring a skim of filler. But was wondering if the bond with the primer{semi-smooth }within 24 hrs would be ok or would it be better to leave for 3 days then sand {roughen -up and apply filled then ? Thanks