Im finally starting to tack the piping and im wondering what is considered enough clearance for things like the radiator hoses etc. Right now I have about 1" of clearance between the piping going into the turbine flange and my lower rad hose. If everything is wrapped do you think that would be enough?


2000 dakota 418 magnum paxton novi 2k T56