Quote: This is my starting point for the '11 edition of drag week, just got it back from getting the floorplan all welded back up from the driveshaft explosion back last November...guess I move alot slower than you!!
I do everything myself... by next week I should have all the bad floor out and have all the tubing I'll need and start on the chassis with in 2 weeks... got 90% of the engine, I have a 9" that I need to cut down, got the struts and rear shocks and wheel(might have to get different rears)... the one thing I'm still working on is trans... if I want to go with a over drive