Originally Posted by moparmarks
So all the panels are on the same structure?
The bond need to be at the first or main point of disconnect. So if you have one meter feeding a main panel the bond needs to be at that panel. If you have a meter feeding a main braker or disconnect then to a panel then the bond needs to be in the disconnect switch.


This is correct.

Do you have 2 meters or 1? In general, I don't believe that code allows multiple services to feed a single residence but I would need to look it up to be sure. Really need more info to properly answer your question.