Originally Posted by DAYCLONA
[quote=Stanton]
Quote
a 200 amp service is pissing money away.



If your going "by the book," (permits/inspection) a 200 amp panel is the requirement in some State codes


The max main panel (typ w/meter) amperage will be dictated by the capacity (ampacity) of the Electric Companies service wire (OH) or cable (UG) that directly feeds that panel

There may be minimum panel amps installed per AHJ (authority having jurisdiction).

Last edited by autoxcuda; 02/23/21 02:13 PM.