Originally Posted By CMcAllister
Originally Posted By MR_P_BODY
I have that zip tie tool also.. I wish
I would use it more often.. those SHARP
cuts sure will cut you up.. my hands right
now have about 15 small cuts from those zip
tie ends(from doing the MSD box)... 99% of
the ties I use are the black UV ones.. I have
bags of zip ties of assorted sizes
wave


Buy the cheapo white ones for initially assembling the harness. Better quality black ones for final assembly. Adds up when your using hundreds of them.


When we were doing the trip cars we would leave
the tie raps just started(dont tighten them).. that
way we could slide more wires in if needed.. the bulk
of the wire we ran were thermocouple wires.. when it
was wired we would organize the bundle them tighten
it up using the zip tie tool and it cuts the tag off..
and believe me the engineers always wants more stuff
added
wave