Thank you for the replies.
It has kinda been solved.
I took out the cabinets to get to the rotten subfloor and discovered that the floor already had 1/4" Luan plywood on top of the subfloor. The water seeped in between the Luan and the plywood subfloor destroying about 1/2 the kitchen floor.
I will have top replace all but about 1/3 of the 1/4" plywood so the sticky will be removed by force. LOL
Now I have to deal with the subfloor where it intersects the walls. Maybe another post.
Thank you for the help and any other advice is always appreciated.