5 days left!
Was only able to spend 4 hours in the shop today (this makes 16 hours total).
Installed the radiator, tranny cooler, rad overflow, rad/heater hoses, wiring harness under the dash, guages and cut the rear wheel wells to accept the tires. I took before/after pics but left the camera out in the shop. I will post update pics tomorrow.
Here is what's left:
-master cylinder
-steering column
-battery tray
-engine wiring harness
-floor shifter
-driveline (still need to find a core to get one made up)
This should be doable in the next 5 days