Originally Posted by JDMopar
I think I would wait on welding the frame connectors in, until the new pan was welded in place. If there is a slight difference in the old pan and the new AMD pan....it would be a pain in the butt to weld the new pan in if it was a fraction deeper than the original. twocents


I agree. I had to scribe my US Cartool frame connectors to the floor plan in some locations for a nice fit so I think you are better off scribing to the new installed floor plan.