Next is lines. Order is: PS pump to Hydroboost in, hydroboost out to PS box, return from both tied together and then back to pump. I threw in a cooler on the low pressure side, junk yard piece off an excursion, $10.

IMAG0170.jpgIMAG0174.jpgIMAG0173.jpg