Sorry everybody, I know its been a while. i have gone through 3 jobs, almost got married, and finally gotten back to my project. Since my last post I became a manager at my LPH, ordered a 20 gal fuel cell, installed a new carb (after rebuilding the original), installed a push button starter and a stealth toggle switch.
What is left on the to-do list:
1.) Wire in my new tail light assemblies
2.) Evict the residents of the wasp nest developing along the bed rail.
3.) installing my fuel cell.
4.) Passing inspection.
![smile smile](/ubbthreads/images/graemlins/custom/smile.gif)
5.) Redoing the bed floor
6.) Removing horrible Camo.
Whats done:
1.) Brakes
2.) Carb
3.) New ignition system
4.) Replaced steering wheel.